How these calculations are verified
What this site is
Engineer Panel is a set of electrical calculators built for the US market on one code only: the National Electrical Code (NFPA 70). Tools here finish the job a screening calculator leaves open. Derating is applied, voltage drop is checked against ampacity so you can see which one governs, breakers come from the standard sizes, and fault current is carried through the feeder to your panel.
Code edition policy
Every engine reads its tables from a data file labelled by standard and edition. The current file is nec-2023, and NEC 2023 is the default everywhere on the site. NEC 2026 exists and renumbers the load calculation articles (Article 220 becomes Article 120). When the 2026 data file lands, it will be selectable per tool and labelled on every result it touches. Nothing silently changes edition underneath a result you already printed.
Reviewer status, stated openly
No licensed reviewer has signed yet. Until one does, pages on this site say only what is true: Built to NEC 2023 tables. No page claims a professional review that has not happened, no reviewer is named who has not reviewed, and no credentials are displayed that were not earned. Recruiting a named, licensed US reviewer is the top priority; when one signs, their name, licence and review date will appear on every sizing tool.
How the numbers are checked
Each flagship tool carries locked worked examples: inputs whose correct outputs were verified by hand before the tool shipped. The examples render on the tool page and run through the tool's own engine, so a regression shows up in public, not in a test file nobody reads. Code tables are cited on the result itself (for example Table 310.16, 310.15(B)(1), 240.6), and we compute from NEC methods and cite table numbers rather than reproducing the NFPA's copyrighted tables in full.
Corrections policy
If a number here is wrong, we fix the engine, fix the anchor if the anchor was wrong, and note the correction on the tool page with its date. Planning calculations only: final design, conductor and equipment selection, and permitting stay with your authority having jurisdiction and your licensed electrician.
Guides
Guides exist to feed tools, one per cluster, and none publishes before its tool. Planned with the flagships: how to size a breaker under NEC 240, wire size when ampacity and voltage drop disagree, why UPS nameplate runtime overstates the real figure, and a transformer protection worked example under 450.3. The first guides are published on the guides index, and more appear there as they ship.