What Size Breaker for a Welder - NEC 630 Duty-Cycle Rules
A welder is the one home-shop load where the wire may legally be smaller than the breaker behind it suggests. Article 630 rewrites the usual relationship between conductor and breaker around the welder's duty cycle; this guide works the multiplier table and a home-shop example end to end.
Built to NEC 2023 tables. No reviewer claim until a licensed reviewer is signed.
Why welders break the normal rules
Every other sizing rule on this site assumes the load can run forever. A welder cannot. Its duty cycle is the share of a ten-minute period it can deliver rated output before heat forces a rest: a welder rated 20 percent welds for two minutes in ten at full output and idles or cools for the rest. Conductors heat on average current over time, so a conductor feeding a load that rests 80 percent of the time never sees the thermal duty its nameplate current implies. Article 630 is built on that fact. Under 630.11, the conductor ampacity is the welder's rated primary current multiplied by a duty-cycle factor from Table 630.11(A). Under 630.12, the breaker is relieved of its usual job of protecting the conductor against overload, which the duty cycle already does, and is sized only for short-circuit and ground-fault protection, permitted up to 200 percent of the rated primary current. The result looks wrong to anyone trained on ordinary circuits, and it is correct: the protection jobs have been split, exactly as they are on a motor circuit.
The multiplier table, worked on one welder
Take a welder nameplated at 50 A rated primary current, a common full-size shop machine, and run it down the duty-cycle table. The copper column is the smallest size whose Table 310.16 ampacity at 75 C reaches the adjusted current.
| Duty cycle | Multiplier, Table 630.11(A) | Conductor ampacity needed | Smallest copper (75 C) |
|---|---|---|---|
| 100 percent | 1.00 | 50.0 A | 8 AWG |
| 80 percent | 0.89 | 44.5 A | 8 AWG |
| 60 percent | 0.78 | 39.0 A | 8 AWG |
| 40 percent | 0.63 | 31.5 A | 10 AWG |
| 30 percent | 0.55 | 27.5 A | 10 AWG |
| 20 percent | 0.45 | 22.5 A | 12 AWG |
Read the shape of it. A welder that could weld continuously is an ordinary 50 A load on 8 AWG. The home-shop reality, a 20 to 30 percent duty cycle at rated output, and less at the outputs actually used, drops the conductor requirement to 10 or 12 AWG. Nothing about the machine changed; what changed is the honest accounting of how long it can draw the current. The breaker size calculator covers the ordinary continuous and non-continuous cases; Article 630 is the standing exception its results do not apply to.
The home-shop example, end to end
Put the same 50 A machine at its nameplate duty cycle of 20 percent, the rating stamped on most transformer stick welders of its class. Conductors: 50 A times 0.45 is 22.5 A of required ampacity, so 12 AWG copper, at 25 A in the 75 C column, is code-sufficient for the dedicated welder circuit. Breaker: 630.12 permits up to 200 percent of 50 A, a 100 A ceiling, a figure that exists to let the breaker ignore the arc-strike inrush and the transformer's magnetising surge rather than to invite a 100 A device. What actually gets installed is the breaker the welder's instructions specify, commonly a 50 A two-pole breaker for this class of machine, because manufacturer instructions carry the force of the listing under 110.3(B) and the maker has already matched the device to the machine's internals. The finished installation, a 50 A breaker feeding 12 AWG conductors, would be a violation on any general circuit in the building and is a compliant, ordinary welder circuit, because the conductor's overload protection is the duty cycle itself and the breaker's only remaining job is clearing faults.
Inverter welders changed the nameplate, not the rule
Most new home-shop welders are inverter machines rather than transformer machines, and their plates read differently: many state an effective primary current, the duty-cycle-adjusted figure itself, alongside the maximum primary current, and some specify the supply breaker outright. Nothing about Article 630 changes; the rated primary current and the rated duty cycle still feed the same multiplier table, and where the maker has already done the multiplication and printed the effective current, that figure is the conductor basis directly. Inverter machines also draw their current in a different shape, with power factor correction on better units softening the arc-strike surge the 200 percent breaker ceiling exists to absorb. The plate, read carefully, still governs, and the instructions still outrank any general table, this one included.
The limits of the exception
Article 630 buys its smaller wire with restrictions, and they are the difference between using the rule and abusing it. The reduced conductor belongs to the welder's individual branch circuit and to nothing else: the same run cannot serve a receptacle, a heater or a second machine, because those loads carry no duty-cycle limit and would load the small conductor exactly as the ordinary rules fear. The sizing follows the nameplate of the welder actually connected; replace the machine with a higher-duty-cycle unit, an inverter welder rated 60 percent at full output, say, and the multiplier and the wire size must be worked again from the new plate. Group installations of several welders get their own demand treatment under 630.11 for the shared feeder, smaller than the sum for the same diversity reason. And none of it touches the receptacle question in an ordinary shop circuit: a general-purpose outlet wired for tools that are not welders follows the standard rules the wire size calculator applies, ampacity, derating and voltage drop in the usual order.
Planning only
This guide is a planning reference built on NEC 2023 methods. The welder manufacturer's instructions govern the specific machine, local amendments vary, and the final selection for a real installation belongs with your authority having jurisdiction and your licensed electrician.